
In December 2024, Huade Hydrogen Energy successfully delivered the HyESS-C commercial hydrogen-electric energy storage system to a Chinese customer. The system mainly integrates a 10Nm3/h PEM water electrolysis hydrogen production system, 7KG 3Mpa hydrogen storage, a 35kW PEM fuel cell cogeneration system and related supporting equipment. The successful delivery of this set of equipment not only represents the further improvement of the company's equipment manufacturing capabilities, but also represents the company's strengthening of the full-process engineering capabilities such as general contracting, construction, construction and commissioning.
Detailed Explanation
Recommend
Copyright © 2026 Jiangsu HuaDe Hydrogen Energy Technology Co., Ltd. All Rights Reserved. Powered by Bomin