H2ES-5
Items | Parameters | Remarks |
Model No. | H2ES-5 | |
Fuel | Natural Gas, Biogas | |
Fuel consumption | <1.5Nm3/h | |
Rated Output Power | 5kW | can be adjusted to be 2.5kW |
Rated Output Heat | 7.5kW | can be adjusted to be 3.75kW |
Total efficiency | 85%-93.5% | |
Electrical efficiency | 35%-40% | |
Output Power Voltage | 380VAC, three-phase | customizable |
Output hot-water temperature | 50ºC~70ºC | |
Output hot-water flow | 300 kg/h | based on the water temperature difference at 20℃ |
Certificates | CE-LVD/CE-EMC/CE-GAR | |
Dimensions(L*W*H) | 750*1230*1630mm | |
Weight | Approx 600Kg | |
Warranty | 1 year (free) or 10 years (optional) |
H2ES-5 has been updated to 3rd generation. The 3rd generation is equipped with a touch screen and the inner structure has been optimized.
H2ES-5 natural-gas-reformed hydrogen fuel cell system is composed of 6 parts:
reformer module
fuel cell stack module
power control module
heat management module
base frame
control system
Input & Output Connections are as follows:
High energy conversion efficiency: Up to 40% electric efficiency and up to 93.5% overall efficiency, much higher than other types of power generation technologies nor CHP technologies
Long lifetime: the equipment is designed for 40000h lifetime
The maintenance costs will be charged at a fixed rate every year. There are no more hidden costs!
For maintenance, our distributors will offer a 10-year maintenance contract. This maintenance contract is necessary for the funding via KfW.
The system can be maintained remotely via a network connection. So minor faults can be quickly rectified without the need for a technician to be on site. In addition, the system must be checked every 12 months. For this purpose, the system can't work for 1-2 days and all necessary tests will be conducted.
When installing H2ES-5 fuel cell CHP system, you will need an natural gas connection as well as an extra flue pipe for the system.
Notice: the existing flue pipe which discharges the exhaust gases of your condensing boiler can't be used.
In addition, the installation room must have a connection to the network, tap water, drain and the state power grid.
It makes much sense to couple fuel cell system with other energy technologies.
1) coupled with a gas boiler is a typical option (shown as following picture).
2) coupled with a heat pump for buildings with very high heat demand is also a good option. The electricity generated by the fuel cell CHP is used to power the heat pump.
3)Coupled with solar PV system is also a good option.
Items | Parameters | Remarks |
Model No. | H2ES-5 | |
Fuel | Natural Gas, Biogas | |
Fuel consumption | <1.5Nm3/h | |
Rated Output Power | 5kW | can be adjusted to be 2.5kW |
Rated Output Heat | 7.5kW | can be adjusted to be 3.75kW |
Total efficiency | 85%-93.5% | |
Electrical efficiency | 35%-40% | |
Output Power Voltage | 380VAC, three-phase | customizable |
Output hot-water temperature | 50ºC~70ºC | |
Output hot-water flow | 300 kg/h | based on the water temperature difference at 20℃ |
Certificates | CE-LVD/CE-EMC/CE-GAR | |
Dimensions(L*W*H) | 750*1230*1630mm | |
Weight | Approx 600Kg | |
Warranty | 1 year (free) or 10 years (optional) |
H2ES-5 has been updated to 3rd generation. The 3rd generation is equipped with a touch screen and the inner structure has been optimized.
H2ES-5 natural-gas-reformed hydrogen fuel cell system is composed of 6 parts:
reformer module
fuel cell stack module
power control module
heat management module
base frame
control system
Input & Output Connections are as follows:
High energy conversion efficiency: Up to 40% electric efficiency and up to 93.5% overall efficiency, much higher than other types of power generation technologies nor CHP technologies
Long lifetime: the equipment is designed for 40000h lifetime
The maintenance costs will be charged at a fixed rate every year. There are no more hidden costs!
For maintenance, our distributors will offer a 10-year maintenance contract. This maintenance contract is necessary for the funding via KfW.
The system can be maintained remotely via a network connection. So minor faults can be quickly rectified without the need for a technician to be on site. In addition, the system must be checked every 12 months. For this purpose, the system can't work for 1-2 days and all necessary tests will be conducted.
When installing H2ES-5 fuel cell CHP system, you will need an natural gas connection as well as an extra flue pipe for the system.
Notice: the existing flue pipe which discharges the exhaust gases of your condensing boiler can't be used.
In addition, the installation room must have a connection to the network, tap water, drain and the state power grid.
It makes much sense to couple fuel cell system with other energy technologies.
1) coupled with a gas boiler is a typical option (shown as following picture).
2) coupled with a heat pump for buildings with very high heat demand is also a good option. The electricity generated by the fuel cell CHP is used to power the heat pump.
3)Coupled with solar PV system is also a good option.